Vallourec Star Pipe and Finishing Mill
Client
Vallourec Star
Youngstown, Ohio
- 200,000 cubic yards of concrete
- 150,000 cubic yards of excavation
- 272,827 lineal feet of underground/embedded conduit
- 27,150 lineal feet of underground pipe
- Over 12,300 anchor bolts
- Scale pit
Project Details
The new one-million-square-foot, seamless pipe mill sits on a 106-acre site. The new mill is 5/8 of a mile long, 1/4 mile wide, and equivalent to 10 stories in height. The finishing mill is located on the south half of the one-million-square-foot building. The finishing mill includes a Threading Line, Quality Assurance Line, Heat Treat Line, and Bundling Line.