UPMC Shadyside Level G Pharmacy

UPMC Shadyside Level G Pharmacy
Client

UPMC

Location Pin

Pittsburgh, Pennsylvania

  • Renovation
  • Seven phases
  • 33 months of construction
  • Construction manager at risk

Project Details

Renovations and upgrades were made to the main pharmacy on the ground floor of the hospital that consisted of seven separate phases. Major work includes installation of a new air handling unit and associated platform on the exterior of the building including an interconnecting decoration bridge to enclose the ductwork as it travels to the main hospital.  Also included is the installation of all new MEP systems and upgrades to the interior finishes. With the rest of the hospital outside the work area still in operation, a coordinated effort was made to maintain the systems while construction continued.