Enable JavaScript to ensure website accessibility Shell Franklin | Mascaro

Shell Franklin

Shell Franklin
Client

Shell Appalachia

Location Pin

Monaca, Pennsylvania

  • 8,500,000 cubic yards of excavation
  • 365,646 linear feet of H-pile/soldier pile
  • 131,126 square feet retaining wall 
  • 30,000 cubic yards of concrete
  • 15,306 linear feet of underground process pipe
  • 836,000 square feet of HDPE geocomposite membrane

Project Details

Running concurrent with the site development package, the work focuses on the remediation of contaminated soils. The majority of the site preparation work will be concentrated along the riverfront and in the brickyard landfill area. Crews are required to have Hazwoper 40-hour training.

  • Redevelopment of a 400-acre industrial site
  • Two bridges
  • Five lift stations, 32,000 linear feet of utility piping 
  • 44,000 linear feet of fence