Metal Building Systems at Energy Center

Client
Confidential Client
Pennsylvania
- 973 cubic yards of concrete
- 104 anchor bolts
- 133 tons of structural steel
- 15 months of construction
Project Details
Mascaro constructed the metal building systems for an administration/control building, a warehouse building, and a reclaim water treatment building. Self-perform work included the concrete foundations and slabs, the steel erection of buildings, and select interior finishes in the administration control building.