Enable JavaScript to ensure website accessibility Longview Power Plant | Mascaro

Longview Power Plant

Longview Power Plant
Client

Gen Power Holdings LP

Location Pin

Maidsville, West Virginia

  • 29,000 cubic yards of concrete
  • 1,500 tons of rebar
  • 1,000-linear-foot limestone conveyor
  • Limestone handling building
  • Complete limestone handling equipment installation
  • Turbine pedestal installation

Project Details

For the Longview Power Plant, Mascaro completed the turbine building foundations, slab-on-grade, and equipment foundations; the cooling tower basin and pump pit; step-up and auxiliary transformer foundations; and the water treatment area foundations. Mascaro also erected the pre-engineered steel building housing limestone storage and the stacker conveyor inside, as well as the five limestone conveyors with over 1,000 linear feet of 24-inch belt, and one 120-foot bucket elevator.