Enable JavaScript to ensure website accessibility Keystone Generating Station Railroad Bridge | Mascaro

Keystone Generating Station Railroad Bridge

Keystone Generating Station Railroad Bridge
Client

NRG Energy

Location Pin

Shelocta, Pennsylvania

  • 70-foot-long single span bridge
  • Pre-stressed box beams
  • 1,040 cubic yards of concrete
  • H-pile deep foundations
  • Three railroad tracks
  • Design-builder contractor

Project Details

This project involved the construction of a 70-foot span railroad bridge for the Norfolk Southern main rail line into the Keystone Generating Station. The bridge incorporated precast adjacent box beams, and the work scope included rail scales to weigh gypsum discharged from the plant.