Enable JavaScript to ensure website accessibility Keystone Pre-Treatment System and Pumphouse | Mascaro

Keystone Pre-Treatment System and Pumphouse

Keystone  Pre-Treatment System and  Pumphouse
Client

NRG Energy, Inc.

Location Pin

Shelocta, Pennsylvania

  • New construction
  • 2,350 cubic yards of concrete
  • 12 months of construction
  • Design-build contractor

Project Details

A facility that treats raw water pumped from the intake structure, which supplies the Flue Gas Desulfurization (FGD) process. This facility also discharges the treated waste water over 15 miles to the river.