Hydro Electric Plant

Client
First Energy Corp.
New Jersey
- Renovation of 107 feet high dam intake structure
- Erect two temporary steel cofferdams 23 feet wide and 30 feet tall with bypass piping
- Install two 12 feet by 30 feet wheel gates with lift assemblies
- 2,530 cubic yards of mass concrete
Project Details
Mascaro installed the upper reservoir emergency shutoff gate for this operating power generating station.