  • 487 cubic yards of concrete
  • 128 anchor bolts
  • Work performed in active shop
  • Aggressive 2.5 month schedule

Project Details

An electric arc furnace (EAF) was added to the newly expanded melt shop. Mascaro’s scope of work included excavation, subgrades, installation of rebar and forms, and placement of concrete slabs, walls, and anchor bolts.