Deicing Stormwater Treatment Plant Phase 2B
Client
Allegheny County Airport Authority
Coraopolis, Pennsylvania
- 150,000 cubic yards of excavation
- 400 linear feet of cast-in-place concrete weir wall
- 2,500 linear feet of piping
- 210,000 square feet of geosynthetic clay liner
- 30,000 square feet of concrete revetment
- Two pump houses
Project Details
The ponds serve as holding tanks for the contaminated water that is collected from rain run-off from the runway that contains de-icing.