Boulevard of the Allies (S.R. 885)

Client
Pennsylvania Department of Transportation
Pittsburgh, Pennsylvania
- Reconstruction of right lane and four structures
- 1.669 miles
- Precast concrete cantilever slab system
- Rockfall retaining system
- General contractor
Project Details
With an accelerated schedule, the primary focus of this project was the reconstruction of the outbound lane and stabilization of the hillside. A Rockfall Retaining System was placed along the Parkway West below the Boulevard of the Allies along with additional slope protection netting.