Antero-Ohio River Withdrawal
Client
Antero Water
Sisterville, West Virginia
- 36-inch fused HDPE pipe Ohio River intake
- Cofferdam
- 32 feet deep shaft, 25 feet by 17 feet wide
- Four vertical turbine pumps
- Chemical supply and electrical feed facilities
Project Details
Mascaro constructed a fresh water withdrawal pumping station along the Ohio River to supply Antero’s Pioneer Freshwater Impoundment, which is located 12.4 miles from the site.