AEP Mitchell Slurry Dewatering and Coal Pile Runoff Collector
Client
American Electric Power Company
Moundsville, West Virginia
- 2,800 linear feet of pipe
- 5,640 linear feet of conduit
- 270 cubic yards of concrete
Project Details
Mascaro constructed a precast water collection pit to collect runoff (rain, snowmelt, etc.) from the coal pile. The surface water runoff is pretreated before it is pumped out for further/final purification. Construction included a sump (below-ground vault), tank foundation, power and instrument wiring, and piping from the tanks to the sump pump.